MetaData for Campbell Road Sediment Abatement Plan
Campbell Road Sediment Abatement Plan
Identification Information
-
Citation
- Originator: Curry Soil and Water Conservation District
- Publish Date: 3/27/15
- Online Link:
None
- BPA Project #:
-
Contact Information
- Agency: Soil and Water Conservation District
- Name: Matt Swanson
- Job Position: Project Manager
- Telephone: 541.373.0800
- E-Mail Address: matt.swanson@currywatersheds.org
-
Description
- Abstract: A sediment abatement management plan for Campbell Road Mainline and Spur 1 that was developed from road inventory data collected by the Curry SWCD in 2009.
-
- Purpose: Sediment abatement road upgrades and decommissioning.
-
- Time Period of Content: 2015
- Geographic Extent: Lower Chetco River watershed
- Status: Draft
- Use Constraints: The road network is privately owned.
- Format: Access database and Excel spreadsheet
Data Quality Information
- Lineage-Source: Road inventory data collected by the Curry SWCD using their inhouse protocol. Post processed using a Microsoft Access database and Excel spreadsheets.
Data Information
- No data information was supplied.
Entity and Attribute Information
- Attributes Description: Road treatments and estimated costs.
Is a physical copy maintained for reference at Headquarters?
Unknown
Files
|